We continue to improve the logistics infrastructure for comfortable handling of bulky goods. Especially for the convenience of heavy-duty vehicles, we have developed a new driving route from Dimitrovgrad highway to the SVH VAVS and upgraded the entrance area.
Now the delivery of oversized items to our warehouse has become even easier and safer.
What we have done for your convenience:
1. Optimal route of movement. A clear route has been developed from the Dimitrovgrad highway, taking into account all the features of moving large-sized vehicles and road trains.
2. Wide roadbed. The width of the roadway along the entire route is more than 8 meters, which allows even the largest vehicles to maneuver without the risk of hitting obstacles.
3. Increased turning area. At the intersection of the 11th and 44th Engineering passageways, a large turn area of 45 meters is provided – this is enough for comfortable passage of trucks and road trains with trailers.
4. Upgraded entrance to the territory. The Air Force expanded the entrance gate by rounding the corners of the entrance group. The width of the widest part has now become 22 meters. This allows you to enter the SVH without unnecessary maneuvers and reduces the risk of damage to cargo and vehicle.
The new scheme was developed primarily for carriers of construction machinery, industrial equipment, metal structures and any other oversized cargo. We have done everything possible to ensure that the process of delivery and acceptance of cargo at the SVH takes a minimum of time and does not require additional efforts from drivers.



